Corrosion resistant and concreting works along with strengthening by the application of Carbon Fiber

Condition of Unashi Bridge before rehabilitation works by HEAPL

Removal of rust from corroded rebar and application of zinc enriched corrosion resistive chemicals before concreting works

High strength concreting after installation of formwork for damaged section

MBrace Laminate Carbon Fiber applied below bridge girder and deck after concreting works

Finishing works for the Unashi Bridge after complete treatment works