Corrosion resistant and concreting works along with strengthening by the application of Carbon Fiber


Condition of Unashi Bridge before rehabilitation works by HEAPL


Removal of rust from corroded rebar and application of zinc enriched corrosion resistive chemicals before concreting works


High strength concreting after installation of formwork for damaged section


MBrace Laminate Carbon Fiber applied below bridge girder and deck after concreting works


Finishing works for the Unashi Bridge after complete treatment works