Corrosion resistant and concreting works along with strengthening by the application of Carbon Fiber
Condition of Unashi Bridge before rehabilitation works by HEAPL
Removal of rust from corroded rebar and application of zinc enriched corrosion resistive chemicals before concreting works
High strength concreting after installation of formwork for damaged section
MBrace Laminate Carbon Fiber applied below bridge girder and deck after concreting works
Finishing works for the Unashi Bridge after complete treatment works