Lifting of settled bridge in Satashi Dham using hydraulic jack and construction of new abutment

Condition of Satashi Dham Bridge before rehabilitation works by HEAPL

Detail Survey conducted by HEAPL prior to rehabilitation works

Construction of 2 RCC base on either side of existing settled pier for bridge lifting

Lifting of settled deck of Satashi Dham bridge using hydraulic jack installed over newly built RCC bases

Installation of anchor rods below the deck slab after lifing the deck upto the original levels

High strength concrete pier constructed below the settled deck

Glance of Satashi Dham Bridge after complete repair works by HEAPL