Lifting of settled bridge in Satashi Dham using hydraulic jack and construction of new abutment


Condition of Satashi Dham Bridge before rehabilitation works by HEAPL


Detail Survey conducted by HEAPL prior to rehabilitation works


Construction of 2 RCC base on either side of existing settled pier for bridge lifting


Lifting of settled deck of Satashi Dham bridge using hydraulic jack installed over newly built RCC bases


Installation of anchor rods below the deck slab after lifing the deck upto the original levels


High strength concrete pier constructed below the settled deck


Glance of Satashi Dham Bridge after complete repair works by HEAPL